Skip to product information
1 of 8

Absorbine

Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 10lb Tub / 60 Day Supply

Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 10lb Tub / 60 Day Supply

Regular price $154.19 USD
Regular price Sale price $154.19 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • Every serving delivers: 10,000 mg of glucosamine - 5,000 mg of MSM - 1,200 mg of chondroitin - 150 mg of HA - 130 mg of Boswellia serrata - plus flaxseed and rice bran.
  • Use at the first signs of stiffness & no loading dose required. Optimized pellets for advanced joint health and mobility - no fillers!
  • Highly concentrated formula supports a horse's muscle, tendon, ligament, synovial fluid, and cartilage health.
  • Administer once daily. A 5lb bag is a 30 day supply / a 10lb bag is a 60 day supply.
  • Made in the USA.
View full details
  • Sandra P. ⭐️⭐️⭐️⭐️⭐️

    Sized correctly, it sits loose on walks and cinches just enough when he pulls, improving handling immediately. The wide webbing spreads pressure, stitching is tidy, and the bright color stays visible.

  • Marcus L. ⭐️⭐️⭐️⭐️⭐️

    Smooth pin tips lift undercoat without scratching, so my dog relaxes during brushing. Hit the button and the pad retracts; hair peels off in one sheet, and the handle is wrist-friendly.always clean their bowls.

  • Melissa K. ⭐️⭐️⭐️⭐️⭐️

    The top handle and side tabs give my pup a solid bite point and make pickup effortless. High-contrast colors are easy to spot, and it wipes clean; a quick air top-off keeps the shape.

Frequently Asked Questions

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

We do not currently offer free shipping. However, this may be added at some point. We apologize.

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.